26 February 2002 Foundation and groundworks
|
 |
 |
 |
 |
20 March 2002 Pouring concrete first floor
|
 |
 |
 |
 |
29 April 2002 Ready for ring beam and roof frame. Electrical wiring also in place.
|
 |
 |
 |
 |
2 June 2002 Everything in place for roof sheeting. Inside is ready for tiling.
|
 |
 |
 |
 |
28 September 2002 Doing the finishing touches and fine tuning. The completion date was pushed back a bit, due to additions and changes.
|